Further work has been completed on the cab fittings as our pictures show. We have now obtained two injectors and now have all the fittings required to complete number 61.

A LIMITED SPECIAL OFFER ON SEB’S HEART OF AFRICA RAILWAY!
For a limited period only, we can offer a steam hauled trip on Seb’s Heart of Africa Railway for 20 people for just R8500 including VAT! That is a huge saving, so book now while the offer lasts! As an added attraction we can offer a Walking Tour at a special price of just R275 including VAT per head if you take the Seb’s train offer! - Contact us for more information
Further work has been completed on the cab fittings as our pictures show. We have now obtained two injectors and now have all the fittings required to complete number 61.

Great progress has been made on the cab fittings as our pictures show. As mentioned in our last report the regulator assembly has been fabricated and fitted and now the boiler mounts on the backhead have been made up from various spares we had together with the vacuum ejector. The firebox door has been made from scratch and fitted. She’s looking good!


The latest happenings from the Sandstone Steam Railway, the August 2018 Steam Report - Click here to read

Wondering what Stars of Sandstone 2019 will be like? Take a look at the example videos below.
The first phase of the cosmetic restoration of 1555 is nearing conclusion with the locomotive now painted together with the tender tank. The painting of the tender frame is nearly complete. Our final picture shows some of the extremely rusted boiler cladding and other components that will need to be replaced when the Transnet tender for Phase 2 of the restoration to final assembly is awarded.

The restoration is now picking up pace with the fabrication of the regulator lever assembly and its fitment to the boiler backhead. The main steam pipes have now been assembled in the smokebox.
