Welcome to the Sandstone Estates website! Click on “About Us” to learn more about Sandstone and the Heritage collection. Please note we do not accept cash payments at Sandstone, only Debit Cards, Credit Cards, EFT payments & mobile application payments.
A LIMITED SPECIAL OFFER ON SEB’S HEART OF AFRICA RAILWAY!
For a limited period only, we can offer a steam hauled trip on Seb’s Heart of Africa Railway for 20 people for just R8500 including VAT! That is a huge saving, so book now while the offer lasts! As an added attraction we can offer a Walking Tour at a special price of just R275 including VAT per head if you take the Seb’s train offer! - Contact usfor more information
Work continues apace at Sandstone on the engine units for 155. The frames have been thoroughly cleaned and painting them in red ochre has begun. The bunker of 155 has now joined the front tank in the cleaning line and ready for its first undercoat. Wheels and axle boxes have been cleaned and refurbished. Our gallery shows the various stages and conditions of some of the components.
David Fletcher who designs live steam models for Accucraft visited us some time ago and we assisted him with pictures for the Decauville model. One of the examples is our own “Bathala”. Our picture gallery shows David Fletcher with the full size “Bathala” and some pictures of the smaller version. You can learn more about the
The magnetic particle inspection is now complete and the wall thickness testing complete. No cracks were detected in the tube plates and all wall thicknesses are well within specs bar the two back corners but these are cleared by the engineer for welding up. All the small tubes are now annealed and are ready for swaging (all 152 of them!). Window patches for the damaged smokebox are being fabricated and the hollow stays, part of the GPCS inlet system, have bored out. This was quite a long job as the original weld had spread making them difficult to remove. As a critical part of the GPCS system this job has to be exact. Our picture gallery shows the firebox end tube plate after all the weld seams have been measured, the small tubes after annealing, forming of the smokebox patches and the secondary air inlets during machining to remove them.
Further news on the boiler repairs. The firebox tube plate has been polished ready for the magnetic particle and wall thickness inspection on the 19th February. The inspection will include both tube plates and all the welded seams inside the firebox, around the hollow stays (for the GPCS) and the wash out plug holes. Our gallery also shows the new tubes being annealed and the condition of the stays in the water space between the inner and outer firebox.
On Sunday, 16th February 2020, Sandstone hosted a group of 20 from the Western Cape of South Africa. This was a research team and soil management advisors, led by Dr Johann Strauss, who are passionate about Conservation Agriculture. The team consisted of grain and animal farmers focussing on no-till, cover crops and crop rotation.
The group stopped over at Sandstone on their way to a farm visit in Reitz to view our Heritage Site and the collection. A team of 12 oxen were in-spanned to the delight of the group. This was the highlight of their visit and all were in awe! The collection was also a big hit as they could not believe the variety of vintage equipment on display.
“What an experience!”, one comment in the Visitors Book, which summoned up their visit!
While work continues on the boiler in Pretoria, Gert Jubileus and his team have been busy at the Sandstone restoration facility. The overhaul of the engine units for number 155 has begun as our picture gallery shows. The bearings proved to be in great condition and all the components have been stripped from the frames and thoroughly cleaned. The loco has been out of service since 2000 when its boiler ticket expired at ACR so 20 years of accumulated grime had to be removed.
The front tank which was removed from the loco on arrival at Sandstone in 2002 has been brought up to the workshop for refurbishment. The loco will be turned out in its original red livery when the restoration is complete.
Preparatory work on the boiler of number 155 has begun in Pretoria with the old tubes being removed and the tube plates and boiler internals thoroughly cleaned. We now have the specifications for the Gas Producer Combustion System (GPCS) inlets on each side of the firebox which comprise a hollow boiler stay with a steel insert. At each outer end are “swirler” plates which rotate the air entering the firebox above the fire bed. Amazingly we have located a number of new ones in the Sandston store which must have arrived with 155 so many years ago that they were forgotten! Our picture gallery shows arrival in Pretoria and work on removing the tubes and cleaning the boiler in preparation for the retube.
After many years of debate Sandstone Heritage Trust has put the wheels in motion for the restoration of the modified 2ft narrow gauge Garratt Class NGG16 number 155.